              What are the precautions for spraying PTFE on the valve stem

              Source:www.tiantiancps.com      Release date: 2024年12月30日
              Information summary:Valve stem spraying is a key process for improving valve stem performance and extending service life. There are many precautions to be taken during operation: 1. Pre processing Surface cleaning: The surface of the valve stem needs to be degreased, degreased, and derusted. Any oil stains or rust residue will affect the adhesion of the coating. Organic solvents can be used to wipe the surfac
              Valve stem spraying is a key process for improving valve stem performance and extending service life. There are many precautions to be taken during operation:
              1. Pre processing
                    Surface cleaning: The surface of the valve stem needs to be degreased, degreased, and derusted. Any oil stains or rust residue will affect the adhesion of the coating. Organic solvents can be used to wipe the surface first, and then acid washing, alkali washing, or sandblasting treatment can be carried out until the surface presents a uniform and clean metallic luster. For example, sandblasting can remove oxide skin, make the surface roughness appropriate, and facilitate subsequent coating adhesion.
                    Dimensional accuracy protection: Some valve stems have strict requirements for dimensional accuracy. During the early stages of polishing, sandblasting, and other treatments, process parameters should be controlled to avoid excessive removal of materials causing dimensional deviations. If necessary, fixtures can be used for protection to correctly maintain the original dimensions of key parts of the valve stem.
              2. Selection of spraying materials
                    Suitable operating conditions: Select according to the working environment of the valve stem. If it is in a high temperature, high pressure, and strong corrosion scenario, such as chemical pipeline valve stems, high-temperature resistant and corrosion-resistant ceramic coatings or nickel based alloy coatings must be selected; If it is in a normal fluid medium and room temperature environment, organic polymer coatings can meet the requirements.
                    Material quality control: The purchased spray powder, silk and other materials should have reliable quality, and their composition reports and performance parameter certificates should be checked to avoid poor spraying effect caused by impurities and uneven particle size in the raw materials.
              3. Spray coating process
                    Correct parameter adjustment: During spraying, the distance between the spray gun and the valve stem, spraying speed, powder (wire) feeding amount, current and voltage, and other parameters should be adjusted correctly. For example, in plasma spraying, if the spray gun is too close, the coating is prone to overheating and cracking; The distance is too far, the powder melting is insufficient, and the coating is loose and porous. Multiple experiments are needed to find a better parameter combination.
                    Uniformity guarantee: Ensure that the coating is evenly distributed on the surface of the valve stem, whether in the circumferential or axial direction. Through mechanical or automated equipment, the movement trajectory of the spray gun is correctly controlled to prevent local coating from being too thick, too thin, or even leaking.
              4. Post processing
                    Coating curing and heat treatment: Some coatings need to be heated and cured after spraying to improve performance. The heating rate, curing temperature, and duration must strictly follow the process requirements, otherwise the internal stress of the coating will be imbalanced, leading to peeling and cracking; Some metal coatings also require appropriate heat treatment to optimize their microstructure.
                    Quality inspection: Use hardness testing, ultrasonic testing, adhesion testing and other methods to inspect the quality of coatings. If coatings with substandard hardness, internal defects, or poor adhesion are found, they should be reworked and repaired in a timely manner to prevent problematic valve stems from entering the assembly process
              主站蜘蛛池模板: 久久亚洲精品成人| 91在线视频一区| 一本色道久久综合狠狠躁篇| 三级韩国一区久久二区综合| 97色在线视频观看香蕉| 五月激情综合网| 色聚网久久综合| 男女一边摸一边做爽爽| 欧美videosdesexo肥婆| 搡女人真爽免费影院| 国产精品高清2021在线| 国产高清在线精品一区二区三区 | 国产男女猛烈无遮挡免费网站| 厨房掀起馊子裙子挺进去视频| 九九免费精品视频在这里| bbbbwwbbbb搡bbbb| 美女被免费网站91色| 欧美日韩国产在线观看| 焰灵姬你下面好紧| 国产97在线观看| chinese乱子伦xxxx视频播放 | 久久久无码精品午夜| 色聚网久久综合| 浮力影院国产第一页| 婷婷人人爽人人做人人添| 国产乱了真实在线观看| 五月婷婷亚洲综合| 浮力影院国产第一页| 欧美视频亚洲色图| 在线永久免费观看黄网站| 免费无码又爽又刺激高潮视频| 中文在线√天堂| 色视频免费版高清在线观看| 日韩一区二区三区精品| 国产欧美精品一区二区色综合| 亚洲日韩精品欧美一区二区一| 99久久人人爽亚洲精品美女 | 国产精品香蕉在线| 欧美黑人肉体狂欢大派对 | 啊好大好爽视频| 久久久国产精品亚洲一区|