Welcome to Suzhou Xinrongfa Metal Products Co., Ltd.
              CN EN

              Adhering to quality is the life of an enterprise

              Coating spraying of Teflon, tungsten carbide and alumina

              Service hotline:

              15995489385

              + Wechat number:wechat number

              Your location: Home > Information dynamics > Industry dynamics

              Recommended products

              National Service Hotline

              15995489385

              Introduce the nine operating steps of ptfe lining

              Source:en      Release date: 2022年05月20日
              Information summary:With the continuous improvement of high temperature resistance and corrosion resistance requirements of materials, ptfe lining has gradually entered people's field of vision.
              With the continuous improvement of the requirements for high temperature resistance and corrosion resistance of materials, ptfe lining has gradually entered people's field of vision. Relying on its good physical properties, it has been affirmed by many customers, but the specific steps for this type of spraying What is it like? I think many people don't know much about it and are very interested in it. To this end, I will introduce the nine steps of ptfe lining: Step 1: Check     whether there are pores, deformations, gaps and other poor welding conditions on the
                   surface of the sprayed material .      Step 2: Preparation     1. Grinding: Use an angle grinder to carefully grind the burrs, welding slag, sharp corners, and sharp corners on the surface of the material.     2. Degreasing: Use 420 ℃ high temperature degreasing for empty burning, set the holding time according to the size and weight of the workpiece, and burn off the residual oil of the material.     3. Surface roughening: sandblasting adopts 5 to 7 kg air pressure, and the surface of 20# gold steel sand is evenly sandblasted.      Step 3: Pre-treatment of ptfe spraying     1. Put the workpiece on the inner shelf of the oven.     2. Use an air gun with a pressure of not less than 5kg to blow off the dust on the sandblasted surface.     3. Before spraying, the material is preheated and dried to remove the residual water on the surface.      Step 4: Preparation before primer spraying     1. Carry out vulcanization treatment 10 minutes ahead of the spray primer.     2. Check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time to ensure smooth spraying.     3. Wear protective masks, glasses and dustproof clothing.      Step 5: Primer spraying     1. The material used is ECTFE special primer, and the specific type of primer is selected according to customer requirements.     2. The thickness of the sprayed film is about 0.16 mm, and the baking temperature is 280 °C.
                   Step 6: The preparation work before
                  coating is similar to primer spraying. Vulcanize the coating material 10 minutes in advance, and check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time. Ensure smooth spraying.
                   Step 7: Coating operation
                  1. The material used is ECTFE type.
                  2. The thickness of each spraying film is between 0.15mm-0.25mm.
                  3. The sintering temperature is 260°C, and the holding time will vary according to the size and weight of the sprayed material.
                  4. Repeat spraying and sintering.
                   Step 8: Detect the coating
                  1. Use a film thickness gauge to measure the thickness of the ptfe lining to check whether it meets the corresponding standard.
                  2. Check the surface for chromatic aberration, sand, sagging, etc.
                  3. Laser detection is carried out on the surface of the material through the coating detection technology, and no sparks are generated as the standard.
                   Step 9: Pack and transport the materials. Pack the materials
                  with bubble wrap and pearl cotton to avoid bumps and damages during transportation.
                   The above is a brief introduction to the ptfe lining process. If you want to know more details, welcome to our Suzhou Xinrongfa Metal Products Co., Ltd. for consultation and understanding.
              主站蜘蛛池模板: 午夜影院在线视频| 国产人妖另类在线二区| 性色AV无码一区二区三区人妻| 成年女人色毛片| 女人18毛片a级毛片| 国产精品视频区| 国产在线|日韩| 国产18到20岁美女毛片| 全彩无翼乌之不知火舞无遮挡| 人妻少妇精品久久久久久| 亚洲欧洲国产精品久久| 在线播放免费人成毛片试看| 国产精品免费一区二区三区四区 | 性xxxxfeixxxxx欧美| 国产精品福利电影| 四虎影视永久在线观看| 国产精品网址在线观看你懂的| 国产好吊妞视频在线观看| 午夜老司机永久免费看片| 亚洲人妖女同在线播放| 一个人看的www片免费中文 | 456在线视频| 蜜桃臀无码内射一区二区三区| 清纯女神被老头耸动| 无码一区二区波多野结衣播放搜索| 国产精品自在线观看剧情| 嗯啊h客厅hh青梅h涨奶| 亚洲youjizz| 三男三女换着曰| 国产精品香蕉在线| 狠狠操精品视频| 无码中文av有码中文a| 国产精品JIZZ在线观看无码 | 四虎影视紧急入口地址大全| 亚洲国产成人久久综合碰| ww4545四虎永久免费地址| 草草影院地址ccyycom浮力影院37 草草影院最新发布地址 | 中国毛片免费看| 两个人看的www视频免费完整版| 天堂久久久久久中文字幕| 91精品欧美一区二区三区|